Call Us
Send Inquiry
Satcon
ISO CerticateTrade_License_2019
Home » Services » Electrical Design & Drawing Consultancy Services » Direct Stroke Lightning Protection (DSLP) Calculation

Direct Stroke Lightning Protection (DSLP) Calculation

Direct Stroke Lightning Protection (DSLP) Calculation
Send Inquiry
Service Code : E09
Brand Name : Lightning protection design


We prepare Lightning protection risk assesment and Lightning protection zone of protection calculations for extra high voltage substations and industrial installations of large industries like power plants, steel plants, refineries, material handling plants etc. Our engineers are preparing similar calculations for each of the projects we are executing and thus gained high efficiency in delivering the calculation as per best engineering practice and with optimum material involvement. the cal;culation is done as per IS 2309 and Dr. Razevig's method for Indian projects and IEC 62305 & NFPA for projects in Middle East and Africa.


Direct stroke lightning protection (DSLP) measures are taken to protect the very costly equipment, buildings, human lives within the protected properties against very dangerous direct lightning strikes on industrial plants, small & large substations, utility power plants etc.


The main elements of the protective system against directlightning strike in a substation are the lightning conductors, the down comersand the underground earth electrode system. The lightning conductors are asystem of conductors which projects above the objects to be protected acting aslightning receiver, the down comers which connect the receiver with the earthelectrode and the underground earth electrode system which carries lightningcurrent safely to the ground to preclude any possibility of its destructive lightning discharge to the ground through the protected object. There are two types of conductors used for such purpose - Lightning Masts, Shield Wires or a combination of both. 

Trade Information
  • FOB Port
  • By email
  • Payment Terms
  • Telegraphic Transfer (T/T)
  • Supply Ability
  • 3 Per Week
  • Delivery Time
  • 3 Days
  • Sample Available
  • Yes
  • Sample Policy
  • Within a certain price range free samples are available
  • Packaging Details
  • By email
  • Main Domestic Market
  • All India
  • Certifications
  • ISO 9001-2015

SATCON
X


SATCON All Rights Reserved.(Terms of Use)
Developed and Managed by Infocom Network Ltd.