We are involved in offering highly reliable 220KV Switchyard Plan Drawings to our Customers. This is generally connected in two main and one transfer bus scheme. It is either used at National grid level or at Power evacuation switchyard of Mega Power Plants or at main power receiving point of large industries. This 220KV Switchyard Plan is stay connected with Substation Automation System (SAS/SCADA) in control room for remotecontrol of the switchyard. Communication with remote substation can be through PLCC or OPGW.
We have all requisite national/international standards, codes and experience to prepare 220KV Switchyard Plan Drawings.
Technical Details:
Course Name | NA |
Suitable For | EHV Substations & Transmission Lines |
Usage/Application | Detail design |
Type Of Technology | CAD software |
Product Type | Detail Egineering design drawings |
Course Type | NA |
Service Mode | By email |
Feature | Substation design |
Location | World wide |
Service Location | World wide |
![]() |